Truckingboards Truck Drivers Forum

Truckingboards Fax Line (Toll Free)(888) 316-2554

 

 

 

                                                                                                                               


Go Back   Truckingboards Truck Drivers Forum > TRUCKINGBOARDS TRUCK DRIVER FORUMS > TRUCKING NEWS FEEDS
  Contact/Privacy/Help Trucking Jobs   Facebook  Twitter   Add Your Link   Casino


Forum Stats
Members: 24,371
Threads: 59,468
Posts: 705,807
Total Online: 168

Newest Member: rolexwatch


 


Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 07-25-2008, 09:39 PM
Lurker
 
Join Date: Jul 2008
Location: California
Posts: 12
CaltransD10PIO is on a distinguished road
Default Roadwork on NB I-5 & EB SR-120 near Manteca, CA 7/27/08 - 8/3/08

The California Department of Transportation (Caltrans) will be closing multiple lanes on southbound Interstate 5 (I-5) and State Route 120 (SR-120) in the Mossdale Wye area in San Joaquin County.

• Monday, July 28, 2008, 9:00 p.m. until Tuesday, July 29, 2008, 7:30 a.m.

The #3 (right) lane and right shoulder on northbound I-5 from the San Joaquin River Bridge to the I-5/SR-120 separation will be closed. Crews will also be closing the #2 (right) lane and right shoulder on the connector ramp to eastbound SR-120.

• Tuesday, July 29, 2008, 9:00 p.m. until Wednesday, July 30, 2008 7:30 a.m.

The #1 (left) and #2 (middle) lanes on northbound I-5 from the San Joaquin River Bridge to the I-5/SR-120 separation will be closed.

• Wednesday, July 30, 2008 11:00 p.m. until Thursday, July 31, 2008 9:30 a.m.

All lanes on northbound I-5 from the San Joaquin River Bridge to the I-5/SR-120 separation will be closed. The detour will be as follows:

o East on SR-120 to Yosemite Avenue off-ramp
o North on Yosemite Avenue to the westbound SR-120 on-ramp
o West on SR-120 to northbound I-5

• Thursday, July 31, 2008, 9:00 p.m. until Friday, August 1, 2008, 8:30 a.m.

The #3 (right) lane on northbound I-5 from the San Joaquin River Bridge to the I-5/SR-120 separation will be closed. Crews will also be closing the connector ramp to eastbound SR-120. The detour will be as follows:

o North on I-5 to Louise Avenue off-ramp
o The Louise Avenue on-ramp to southbound I-5
o South on I-5 to eastbound SR-120;

• Saturday, August 2, 2008, 11:00 p.m. until Sunday, August 3, 2008, 10:00 a.m.

The #2 (middle) and #3 (right) lanes on northbound I-5 from the San Joaquin River Bridge to the I-5/SR-120 separation will be closed. Crews will also be closing the #1 (left) lane on the connector ramp to eastbound SR-120.

Crews will be paving in this location.

Motorists should expect 30 minute delays. Alternate routes should be taken whenever possible.

This work is scheduled to begin as listed, but is subject to change based on weather conditions.

The contractor for this $14.3 million project is Nehemiah Construction of Modesto, CA.

#

For the safety of workers and other motorists, please Slow For the Cone Zone.


##
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!Share on Facebook!
Reply With Quote

Reply

Tags
manteca, roadwork, sr120

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -3. The time now is 11:43 AM.


Powered by vBulletin®
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.0
vB.Sponsors
Advertisement System V2.5 By   Branden