imported_smooth1222
TB Lurker
- Credits
- 0
the plan is to run them identical. merging them at this point is almost impossible. find a freight center that is not at capacity right now. (door pressure, equipment, staffing). the hubs are even worse. so yes its in the plan, but to pull it off they need a slow down in freight, perhaps towards the fall. That plan may change based on the economy and the competition failing.
so i would assume that your job would be safe at fedex national.
so i would assume that your job would be safe at fedex national.