We had our 1 road bid cut and a 9am peddle run cut. If the paper that's circulating is accurate then we're about to lose 2 UE also. At 106
Did it really slow down that much to have a system wide layoff? I seen it slow down a little but we still had enough freight to keep the two UE’s going that we are losing….
 
Did it really slow down that much to have a system wide layoff? I seen it slow down a little but we still had enough freight to keep the two UE’s going that we are losing….
Thats my thought two. We had enough freight to keep our 3 U.E runs from 063 to 064 plus the ue back position .. Plus the U.E run-meet and turn 042. Now with them getting rid of them. 064 Dayton Linehaul now get to steal away and get our runs.
 