twisted-hippie
Twisted Herb Plantation CEO
- Credits
- 153
In a meeting today, I was told that the FTW bid will be posted on 3/4/12 and will be awarded on 3/11/12....then the pool bids will be posted and awarded on 3/25/12 and the COO will be implemented on 4/8/12.
Any slot not filled on the FTW will be put into the bid pool.....this COO is going through, the Linehaul lanes have to be realigned......the hearing is just to get everything clarified for the record.....AFTER the hearing the pool bid will be held on 3/25/12......KK KK How can we bid on the coo before its been heard
Any slot not filled on the FTW will be put into the bid pool.....this COO is going through, the Linehaul lanes have to be realigned......the hearing is just to get everything clarified for the record.....AFTER the hearing the pool bid will be held on 3/25/12......KK KK How can we bid on the coo before its been heard