wonderring99
TB Veteran
- Credits
- 31
I am entertaining this question to whoever knows something about freight flows in the con-way system .... in our load plan matrix has some of our stem times changed ie ... I am going to use this as an example is USA (sacramento, ca) to XHG (hagerstown, md) now 3 days in the matrix or is it 4 like always has been ... and is the load plan phasing out certain terminals already that are closing at the end of the week so the drivers on the dock wont get the deer in headlights look from the fac fos'