Line- haul dsr's are all frustrated to the level of moving on to other companies at my barn. Here are some reasons:
1. Con-way's adoption of the 70 hour rule. Not all, but a huge majority are working 14 hours every day. No body can work that on a daily basis.
2. That world famous OPTIMIZER causing an increase in work load not to mention the extra expense of moving each involved shipment.
2a. One dsr tells me the number of break trailers initially increased from 80 to 200 at the FAC he runs to. I think that final number has decreased somewhat.
2b. Another dsr told me a pure LLA came to his FAC and it was broke and shipped to 10 different terminals.
And Con-way has it all figured out, while more line-haul are preparing to move on. I know of two possibly three with things in the works. Meanwhile all GO knows is to maintain the hard line.
Responses?
1. Con-way's adoption of the 70 hour rule. Not all, but a huge majority are working 14 hours every day. No body can work that on a daily basis.
2. That world famous OPTIMIZER causing an increase in work load not to mention the extra expense of moving each involved shipment.
2a. One dsr tells me the number of break trailers initially increased from 80 to 200 at the FAC he runs to. I think that final number has decreased somewhat.
2b. Another dsr told me a pure LLA came to his FAC and it was broke and shipped to 10 different terminals.
And Con-way has it all figured out, while more line-haul are preparing to move on. I know of two possibly three with things in the works. Meanwhile all GO knows is to maintain the hard line.
Responses?