ok guys heres the latest out of XEF .
we have an o/b fos who thinks he is being funny .remind you just a little over a year ago he was driver. well when i call in to get my work assignment he says 8 oclock first indy. i am there at 730 ready to go to work i assume he means be ready to drive out the gate at 8 oclock well apparently he dont want you to have your loads till 8 o clock .well what i did was i got to work the other day and asked him if my loads were ready he said at 8 ,i said ok at 7:53 i am hitting the clock because according the log book 7:53 is 8 o clock. well you cant do that thats stealing time .i said well give me me my loads and i wont be stealing time. well he hands the other 2 junior guys their loads then mine. amd top it all off those loads were in the desk drawer and had been closed out since at least 6:630 a couple even earlier than that.
i approached my term manager about he said he woud talk to him about it. well it didnt work the next night my loads were ready at 730 i seen them ,then at 745 i asked if the loads were ready he said no. he flat out lied to me.so at 7:52 he hand s them to ,..the whole time hes watching the clock. well the upside to that was that i ended being late to xin due to construction ironically i was 29 minutes late. had i got my loads and hooked at 730 we woudlnt have been late.
my point is this i guess since my tm didnt do anything about it should i prove my point by leaving when i am told and let the late arrivals pile up or should go to XGO on this?
we have an o/b fos who thinks he is being funny .remind you just a little over a year ago he was driver. well when i call in to get my work assignment he says 8 oclock first indy. i am there at 730 ready to go to work i assume he means be ready to drive out the gate at 8 oclock well apparently he dont want you to have your loads till 8 o clock .well what i did was i got to work the other day and asked him if my loads were ready he said at 8 ,i said ok at 7:53 i am hitting the clock because according the log book 7:53 is 8 o clock. well you cant do that thats stealing time .i said well give me me my loads and i wont be stealing time. well he hands the other 2 junior guys their loads then mine. amd top it all off those loads were in the desk drawer and had been closed out since at least 6:630 a couple even earlier than that.
i approached my term manager about he said he woud talk to him about it. well it didnt work the next night my loads were ready at 730 i seen them ,then at 745 i asked if the loads were ready he said no. he flat out lied to me.so at 7:52 he hand s them to ,..the whole time hes watching the clock. well the upside to that was that i ended being late to xin due to construction ironically i was 29 minutes late. had i got my loads and hooked at 730 we woudlnt have been late.
my point is this i guess since my tm didnt do anything about it should i prove my point by leaving when i am told and let the late arrivals pile up or should go to XGO on this?