All shop locations, and several key fac's around the nation will be doing the rebranding. Large tents are being set up, lifts are being dropped off, decals starting to arrive. Not sure on the specifics on how they will get other barns equipment to these sites. Outside vendor. Was told 8 months to get everything done.